2018년 8월 9일 목요일

GRP TANK for Assembly of Bottom Panel Block





Assembly of Bottom Panel Block


1) Attached the sealing tape to the flange for all of the bottom panel.


2) Method to Apply Tapes
    - The sealing tape should be applied to all assembled flange surfaces.
    - The centre side of the sealing tape should be overlapped by about 50mm


 To assemble a bottom panel block, fIrst connect several bottom panels into a
 sub-block. Determine the block size according to the site condition, the work
 space, number of workers, use or non-use of a crane, etc.


  A block that is too large cause difficulty in relocation and other work.
 Therefore, it is recommended that one block be limited to 10 panels x 2rows.


Arrangement and type of bottom panels.
Place bottom panels one by one upside.
When installing a drain nozzle, place a pit panel in the pre-determined
position.


Assembly of Drain Panel
Using a hole saw(for a small bore),and a jigsaw(for large bore), the
required holes may be cut into panels.